Hydrus has completed the refurbishment and testing of a subsea trees. The purpose of the scope of work required Hydrus to prepare the Xmas tree for use as a high-pressure suspension cap for abandonment wells.
After a complete survey of the tree, Hydrus undertook the following refurbishment:
Clean the Xmas tree
Conduct - received survey of the tree
Remove the SCM - Aker
Function check all valves
Pressure test all valves – above and below
Remove obsolete functions
Purge BRAYCO Sv3 fluid from actuators and pipework
Flush system as per technical spec requirements
Check fluid levels on balance system – subsea parity test
Function test the lock and unlock function on the wellhead connector
Record connector break out pressure
Remove DHPT equipment (where fitted)
Remove downhole chemical injection function (where fitted)
Weld new anodes onto tree
Balance tree
Surface paint work