NEWS ARTICLES 2019
Tree Shipping Frame design and manufacture
Tree Cap refurbishment, test and commission
Construction and assembly of Intervention Riser System (IRS) for international offshore services company
Jacking Frame design and manufacture for Coil Tubing Injector Unit and Goosneck
Tree refurbishment and testing
NEWS ARTICLES 2018
Dual Bore S.I.T (Site Integrated Test) with ESD (Emergency Shut Down) checks
BOP (Blowout Preventer), full 5 year refurbishment, test and certification
Marine Riser - annual inspection, maintenance and repair for major drilling operator
NEWS ARTICLES 2017
Dual Bore Production Riser maintenance, inspection, repair and test for major oil & gas operator
Inspection, repair and certification of Mechanical & Hydraulic Riser Running Tool for oil & gas operator
Routine maintenance and repair of coiled tube lifting frame
300 Ton Oil and Gas Riser Spider Assembly workshop function test and repair project for global operator
On-site checking of Stress Joint and Tubing Hanger Orientation Interface for multiple interfacing companies
Dual Bore Riser inspection, refurbishment and maintenance for oil and gas operator
Repair, test and assembly of emergency disconnect package / lower riser package
Tubing Hanger Crown Plug installation for North Sea Operator
Refurbishment of Surface Tree Actuators for North Sea Platform
Double Stack BOP refurbishment and recertification project
Subsea Trees Mobilisation, Sea Fastening for global destination
Tree Cap Guide manufacture for Tartan decommission project
Tree Cap Running Tools Pressure Testing |